Every machine is built by the engineer who specified itCable management is not an upsellTwo days on the bench before it is allowed to leaveParts chosen for the work, not for a tier listBuilt in Warsaw · Shipped across EuropeBring us the machine nobody else will build

The NXPC studio

Built on a bench,not a line.

Every NXPC is assembled, tuned and tested in Warsaw by the people who specified it. This is what happens between the order and the courier.

Step 01

The brief

Before any part is chosen we work out what the machine has to do: the software, the hours, the room it will stand in and the noise you are prepared to live with. Most specification mistakes are made here, not at checkout.

A written specification, agreed before anything is ordered.

Step 02

Component selection

Parts are picked against the workload rather than a tier list. If the cheaper CPU is the right one because the budget belongs in the GPU, that is what gets specified — and we say why.

No substitutions without asking you first.

02

Component selection

Step 03

Assembly

Built by hand on the bench, in the order that keeps every connector reachable: board out of the case, cooling dry-fitted, then the machine closed around a loom that was measured, not stuffed.

One engineer owns the build from first screw to shipping.

Step 04

Cable management

Routed, combed and tied behind the tray. It photographs well, but the reason is airflow: a chassis moves air the way it was designed to only when nothing is in the way of it.

Every loom cut to length for that chassis.

04

Cable management

Step 05

Thermal tuning

Fan curves, radiator placement and undervolts set for that specific machine, then measured again under sustained load rather than at idle — idle numbers tell you nothing about a render at 2am.

Measured under load, not at the desktop.

Step 06

48-hour burn-in

Two days of stress, thermal and memory testing on the bench. Components fail early or they rarely fail at all, so this is where a bad stick of memory surfaces — here, not at your desk in week three.

The test log stays with your order.

06

48-hour burn-in

Step 07

Packing and delivery

GPU braced, machine double-boxed, accessories and the build record in the same carton. Insured, tracked delivery across the European Union, included in the price you were shown.

Warsaw to anywhere in the EU.

On the bench

Your machine goes through all seven.